ಕರ್ನಾಟಕ ವಿದ್ಯುಚ್ಛಕ್ತಿ ನಿಯಂತ್ರಣ ಆಯೋಗ

Karnataka Electricity Regulatory Commission

ಚರ್ಚಾ ಪತ್ರಿಕೆಗಳು

Home

Sl No Date  Particulars
20 12.03.2024 Consultation Paper on the Proposed Norms for Determining Generic Tariff for Electricity Generated from Mini-Hydel, Bagasse based Co-Generation and Biomass based Power Plants to be Commissioned during the Control period 01.04.2024 to 31.03.2027
19 19.03.2024 Issue of discussion Paper on determination of Solar Tariff-Invitation to public for filing Views / Comments / Suggestions
18 12.03.2024 Discussion Paper on Determination of Tariff and norms in respect of Solar Power Projects (including Solar Rooftop Photovoltaic Projects) for FY25
17 07.07.2023 Discussion Paper on TOD Settlement Procedure
16 07.02.2023 Discussion Paper on Determination of Tariff and norms in respect of Solar Power Projects (including Solar Rooftop Photovoltaic Projects) for FY24
15   Discussion Paper on Determination of generic tariff for Wind Power projects for the period FY2023-24 to FY 2025-26
14 07.11.2022 Discussion Paper for Evacuation / Utilization of Solar Energy Generation at LT / HT Voltage and connect to their LT / HT system
13 28.09.2022 Discussion Paper on the Recovery of Fixed Charges in the Electricity Bills
12   ANNEXURE_28.11.2013.pdf
11   BESCOM_sSubmissionOnWheelingandBankingChargesForRenewableEnergyGenerators.pdf
10   comparative_statement_of_stakeholders_comments_on_Determination_of_Tariff_for_Bagasse_Based_Co-generation.pdf
9 28.11.2013 DISCUSSION_PAPER_28.11.2013.pdf DETERMINATION OF TARIFF FOR BAGASSE BASED COGENERATION PLANTS DURING OFF SEASON USING COAL AS FUEL
8 16.11.2015 Discussion_paper-16.11.2015.pdf “Discussion paper for determination of tariff for Grid-Interactive Rooftop and Small kilowatt scale solar photovoltaic plants in Karnataka
7   Discussion_paper-WB_Charges_June-2014.pdf DISCUSSION PAPER ON ‘WHEELING AND BANKING CHARGES’ FOR RE GENERATORS
6   DiscussionPaperonwheelingchargesBankingCharges.pdf Discussion Paper on “Wheeling and Banking Charges for Renewable Energy Generators”
5 07.07.2014 DiscusssionPaper-07.07.2014.pdf WHEELING, BANKING & CROSS SUBSIDY SURCHARGE’ FOR SOLAR
POWER GENERATORS 
4   Draft_Guidelines_Determination_of_Tariff_for_Bagasse_based_Cogeneration_Plant.pdf
3 23.07.2014 Revision Of Fuel Cost for Existing Biomass Power Generation.pdf
2 21.06.2013 SOLARLETTER-20.06.2013.pdf Discussion paper on Determination of Tariff for gird interactive solar power
plants including rooftop and small solar Photo voltaic power plants in Karnataka’’
1   ScannedStakeholdersCommments.zip
×
ABOUT DULT ORGANISATIONAL STRUCTURE PROJECTS